Raymond Bodnar Paving
Paving of Raymond Bodnar Way will begin on September 8, 2022 and run through the end of the month. One lane of traffic will be maintained through the duration of the project. The Borough Offices and Police Department will remain accessible through the ground floor entrance on Raymond Bodnar Way. Parking will be limited during this project.